LEED PROJECTS

LEADERSHIP IN ENERGY & ENVIRONMENTAL DESIGN

As we shift toward a greener, more sustainable society, adhering to LEED standards becomes increasingly important. We understand the processes required to reach specific levels of LEED certification, we also have the systems in place to manage these processes and the resources at hand to cary out the job efficiently.  Govan  Brown has successfully completed numerous LEED projects, and is a front-runner in the management of environmentally viable construction practices.

We are committed, along with our sub-trade partners, to achieving and demonstrating sustainability in the facilities we help to build.

  
Fidelity Investments

Fidelity Investments

483 BAY STREET, TORONTO, ON


Square Footage: 160,000 +
Market Sector: Financial
Architect/Designer: Straticom Planning Associates
Electrical Engineer: Lapas Consulting Engineers Ltd.
Mechanical Engineer: TMP Consulting Engineers Ltd.
Landlord: Northam Realty Advisors Limited


DownloadDOWNLOAD CASE STUDY

In the past ten years, Govan Brown and Fidelity Investments have worked together on numerous projects.  For this particular project, we were challenged to build three separate spaces simultaneously amounting to a total of 160,000 square feet. These three projects required an extensive amount of coordination between us, the client, the designers and trades. The first phase included a 90,000 square foot expansion of their existing computer room along with the addition of a new, adjacent computer room.  Powered by a rooftop generator, our main goal was to ensure that the existing computer room remained dust-free and that the temperature was controlled. The sensitivity of the equipment stored in the computer room could not be understated; had the room been compromised, the project would have been considered a failure. After our initial area was completed, we moved-in a portion of the staff. We then set off to complete the remaining 70,000 square feet. For this space we designed a 24-hour construction schedule. The remaining floors were to be supervised by two site superintendents during the day and another superintendent at night. Our main goal for this portion of the work was to complete the project on time without causing a disturbance to any of the staff or day-to-day operations of the company. Our ability to conduct complex construction projects is the reason why we are able to retain our clients. We are happy  to have continued partnerships with several of our clients including Fidelity Investments.

 